HVAC load · Equipment sizing · Duct design · ACCA MJ8
Manual J, S & D. from $395, delivered in 5 business days.
We prepare your ACCA Manual J load calculation, Manual S equipment selection, and Manual D duct design from your plans — a permit-ready Wrightsoft Right-Suite report package. We also run commercial load calculations in Carrier HAP. Residential and commercial, all 50 states.
| Deliverable | Cool | Heat | Detail |
|---|---|---|---|
| Manual J — room loads | 28.4 | 41.2 | 12 rms |
| Manual S — equipment | 2.5 t | 44k | AHRI |
| Manual D — ducts | 0.10 | — | 18 runs |
See a sample before you order
SECTION 01Open a full sample Wrightsoft Right-Suite report package — the same format your permit office and installer receive. Reviewing the deliverable up front is the simplest way to know exactly what you’re getting.
- Manual J room-by-room heating & cooling loads.
- Manual S equipment selection vs AHRI/OEM data.
- Manual D duct sizing & layout (when included).
An anonymized sample — a real Manual J/S report with all client and project details removed.
What you get — the J / S / D stack
SECTION 02Manual J — loads
Room-by-room heating and cooling load calculations to ACCA Manual J (MJ8), from your plans and envelope details.
Manual S — equipment
Equipment selection sized to the Manual J loads and checked against the manufacturer’s AHRI/OEM performance data.
Manual D — ducts
Duct sizing and layout to deliver the required airflow to each room at the design static pressure.
Choose your scope
SECTION 03Load calculation
- Room-by-room Manual J loads.
- Whole-house design summary.
- Delivered in 5 business days.
- Free revisions until accepted.
Send your plans and we come back with a flat quote within 2 business hours.
Ask for a quoteLoads + equipment
- Everything in J only.
- Manual S equipment selection vs AHRI data.
- Delivered in 5 business days.
- Free revisions until accepted.
Send your plans and we come back with a flat quote within 2 business hours.
Ask for a quoteLoads + equipment + ducts
- Up to 2,000 sqft$395
- 2,001 – 3,500 sqft$485Most popular
- 3,501 – 5,000 sqft$585
- Over 5,000 sqft or 3+ systemsCustom quote
- Everything in J + S.
- Manual D duct sizing & layout.
- Free revisions until accepted.
The complete J+S+D package is a flat price set by conditioned floor area. J-only and J+S are scoped and quoted on request — 5 business day turnaround, all 50 states.
A NOTE ON 2026 PRICING
The J + S + D bundle is priced by conditioned floor area rather than as one flat figure: $395 up to 2,000 sqft, $485 from 2,001 to 3,500, and $585 from 3,501 to 5,000. $485 is exactly what we charged before, and it still covers most homes — smaller projects simply pay less now, and only genuinely larger ones pay more. Above 5,000 sqft, or with three or more systems, we quote the job.
Earlier in 2026 the flat price moved from $350 to $485. That was Wrightsoft: on 1 April 2026 it consolidated Right-Suite into a single Residential subscription and retired the tier we had been licensed on, at a significantly higher annual cost. Right-Suite is the software every report here is produced in. Nothing about the deliverable changed — the same room-by-room Manual J, the same Manual S selection checked against AHRI data, the same Manual D duct sizing and layout, the same 5 business-day turnaround, and the same free revisions.
Commercial buildings
COMMERCIAL · CARRIER HAPEvery commercial project is scoped and quoted individually. Send your plans and you get a flat, all-in quote before any work begins — no hourly billing, no open-ended engineering fees.
Cooling & heating loads in Carrier HAP
ASHRAE-method cooling and heating loads in Carrier HAP for offices, retail, restaurants, warehouses, tenant fit-outs and multi-system buildings. Permit-ready PDF.
- Offices · retail · restaurants · warehouses · tenant fit-outs · multi-system buildings.
- ASHRAE heat balance method, permit-ready PDF.
Quoted to your project
- Flat quote within 2 business hours.
- Flat quote agreed before work begins.
- Turnaround 1–2 weeks.
Carrier HAP · ASHRAE heat balance method · permit-ready PDF · flat quote before work begins.
Block load vs room-by-room
SECTION 04One load for the whole house
A single whole-building load — quick, and sometimes enough for equipment sizing alone. But it can’t tell you the airflow each room needs.
A load for every room
Loads calculated room by room, so ducts can be sized to deliver the right airflow everywhere. Manual D duct design requires it — so every report we prepare is room-by-room.
How it works
SECTION 05Submit your plans
Send your floor plan, window/door schedule, orientation, and insulation values. About two minutes.
We prepare the report
We build your Manual J/S/D in Wrightsoft Right-Suite to ACCA MJ8 — room-by-room loads, equipment selection, and duct design for your scope.
Review, then final
Your draft arrives by email in 5 business days so you can look it over first. Once you’re happy with it we send the invoice, and your final package follows as soon as payment clears — with free revisions until your permit office accepts it.
What clients say
CLIENT FEEDBACKI hired Sabrul to assist with a project that lasted a couple of years. He is a very kind man and a true professional. His work ethic is beyond what anyone in our team expected. I highly recommend him for the job.
I enjoy working with Sabrul immensely and I have continued working with him on many projects after this. He is a trusted resource and supported all our projects with everything…
Sabrul is a great problem solver. Very easy to work with. Takes the time to understand [our] project’s needs and issues. Did his research to find alternative solutions to problems…
Reviews of the founder’s engineering work, quoted from his client-verified freelance profile.
Our guarantee & common questions
SECTION 06COMPLIANCE STATEMENT
“We prepare your Manual J, S & D to ACCA standards for your project. If your permit office requests changes, we revise it free of charge until it is accepted.”
What are Manual J, S and D?
Block load or room-by-room?
What do you need from me?
Is it accepted by my permit office?
How is the J+S+D price decided?
Why did the price change in 2026?
Do you handle commercial buildings?
When do I pay?
How are my plans handled?
Ready for a permit-ready Manual J / S / D?
Send us your plans and get your ACCA load calculation, equipment selection, and duct design back in 5 business days — revisions until your permit office accepts it.